LFC - External Lighting

Client: LFC

Value: £20,000

Programme: 4 weeks

Challenge: The client brief was to repair and replace at height external lighting illuminating the training field and surrounding areas. This request was time sensitive due to the nature of the area requiring lighting.

Challenges presented consisted of accessing the high-level lights in an efficient and safe manner.

Solution: Sterling Services were able to offer a high-level access vehicle (MEWP) currently within our fleet of vehicles. Our trained and certified electricians were able to perform high access requirements quickly and professionally.

Client benefits: Use of readily available high access equipment allowed Sterling to react and complete works within the tight time and budget requirement. Readily available equipment ensured that there was minimal downtime and no disruption to use of the client facilities.