Goulborne High School - Unisex Toilets

Site

Golborne Secondary School

Client

Wigan MBC

Contract Details

The project was let under a JCT Minor Works Contract.

Programme

6 weeks during the school summer holidays 2023

Brief Description of works

The existing male and female toilets were made into a large single space Unisex toilets with a full refurbishment of all areas, new services, cubicles and sanitaryware. The works included:

Demolition & Strip out works:

·         Isolation of services.

·         Asbestos Removal

·         Demolition of dividing wall

·         Removal of timber stud and cement based toilet partitions.

·         Removal of the existing windows and external walling.

·         Removal of an old tile and grid suspended ceiling and lighting.

·         Removal of all existing floor coverings.

·         Break out the existing floor for new drainage.

New installation works:

·         New above and below ground drainage.

·         Facing brick cavity wall construction and new windows.

·         Complete Plumbing Installation.

·         Full rewire and new lighting

·         New mechanical ventilation from each cubicle to external.

·         MF Bulkhead ceilings above partitions with central tiled suspended ceiling.

·         Roller Shutter Entrance Doors

·         New IPS panels and partitions, including 2 ambulant w.c.s and one fully disabled space.

·         Central WHB island with full length vanity unit and tiling.

·         Full re decoration and installation of new vinyl flooring.

Additional Works Instructed during the contract.

·         Full Refurbishment of a classroom and an office.

·         Double doorway formed between 2 classroom and making good finishes and services.

This work was also completed in the school holiday period.

The completed project has delivered a modern unisex facility for the school.

The client team were very happy with the finished product delivered by the Sterling team and are looking forward to working with us again on future schemes.

The project team consisted of the following: Sterling Services (Directly employed personnel):

  • Contracts Manager

  • Site Manager

  • Electrical Contracts Manager

  • ECA Gold Card Electrician

Sub-contracted Works:

  • Demolition & Strip Out

  • Joinery and IPS systems

  • Brickwork

  • Plumbing

  • Tiling

  • Roller shutters

  • Plastering 

  • MF Ceiling.

  • Decoration

  • Floor finishes

Next