project overview
The completed works aimed to enhance safety and accessibility for students and visitors. A pedestrian guardrail with an integral double gate was installed along the kerb line near the school entrance to ensure controlled and secure access. In the playground, a concrete ramp was constructed to facilitate access to an adjacent footpath. Additionally, the existing footpath was adapted to better suit the new layout, and a speed hump was installed across the roadway. These improvements contribute to a safer environment for the school community.