Projects - Case Studies

Preston Healthport

The Client

NHS Property Services

project overview

The project involved the traditional construction of a single-storey extension to an existing health centre, designed to house new X-ray and ultrasound facilities. Additionally, re modelling and refurbishment works were undertaken on the ground floor, enhancing the reception and waiting areas, creating various specialist clinic rooms with the installation of state of the art diagnostic equipment. The project also included the comprehensive installation of new HVAC systems throughout the facility.

Value Bracket

£750k - £1m

Sector

Healthcare

Work Type

Extension and Refurbishment

Completion Date

Aug 2024

Challenges

The Challenges & Changes

The existing plumbing system was compromised due to defects and significant corrosion in the carbon steel pipework. To address these issues, it was decided to replace the entire central heating system's pipework. The original carbon steel pipes had suffered extensive corrosion, necessitating the use of more durable materials to ensure long-term reliability and efficiency.

DSC03222 copy