The electrical work involved isolating and removing existing lighting, followed by the installation of 8 new fittings using the existing containment and switching.
Four Dryflow fans were installed, and weekend works included, cables running to power sensors for taps in two troughs as well as fuse spurs in each bathroom being loosened to allow for Saniclad installation, and cables were run for two hand dryers in each bathroom to complete the upgrades.