Challenges
The Challenges & Changes
After discovering an unidentified sewer, a section 185 was required to allow a diversion of the live sewer, collaborating with Welsh Water was essential to develop a solution for maintaining continuous service, as the foul and water sewage drainage systems were crucial for both a local care home and a doctor's surgery. The challenge was to ensure that these critical facilities remained operational while addressing the drainage issues effectively.